Recently Completed Custom Built Boat
June 16th, 2010Current Repair Project in the Shop
June 16th, 201046′ Doucette “Luxury Cruiser”
June 16th, 2010We’re Back!!!
July 27th, 2009We apologize for the lack of action on our blog. Some access problems have kept us from updating. It is up and running again please take a look below for some updates and do not hesitate to respond. Feel free to ask any questions. Thanks!!!
Recent Project Status
July 27th, 2009Sales!!!
July 27th, 2009Even with the downturn in the winter’s market that some feared would carry through we have actually sold some boats!!! The 28′ Bertram found a home with a young family who I’m sure will enjoy and care for her. Out of our bay boats, both the 32′ Kinnamon and Doucette have also been sold. Cape Horn’s addition of a couple different models, have been very popular. Our 2008 Cape 31′ is gone as well as the new 2009 31XS w/twin 350’s.
Update 03/06/2009
March 6th, 2009Project Updates 02/20/2009
February 20th, 2009The 32′ RP project is still on schedule. The trunk cabin mock-up is underway and most systems have been installed.
Fresh Imron is covering the 57 Hatteras from the rubrail up, hull has been polished and bottom painted.
With the 29′ Strike we have installed the custom crow’s nest with full controls, gel repairs are complete and the Prop Speed is on. The customer has added a couple of other things including a Flo-Scan install, outrigger relocation and more.
Bilges have been painted, motor reset on new beds, washdown system in and interior renovation almost complete on the 40′ Robbins.
32′ RP Week of 01/23/09
January 26th, 2009Construction and systems installation continued this week. The skeg was filled with expanding foam and heavily glassed over. Fuel and freshwater tanks were covered as the cockpit sole was bonded down and glassed in place. The Bilges received a couple coats of white gel with systems going in as soon as they cured. Engine beds have been fabricated, bonded and thru-bolted in place. The engine, holding tank and hot water heater of been put place for plumbing. Fairing is underway on the v-berth part which has also been tabbed in.