Archive for the ‘Current Projects’ Category

We’re Back!!!

Monday, July 27th, 2009

We apologize for the lack of action on our blog.  Some access problems have kept us from updating.  It is up and running again please take a look below for some updates and do not hesitate to respond.  Feel free to ask any questions.  Thanks!!!

Recent Project Status

Monday, July 27th, 2009

The 32′ customis scheduled for delivery the end of this week.  The finishing touchs are going in place as we speak.

New AwlGrip on Hydra Sport

Custom PPG paint on Donzi

House extension on Island Packet

Update 03/06/2009

Friday, March 6th, 2009

32′ RP: House Mock-Up

28′ Gary Davis: In for deck repairs and paint, refinish teak, wiring and redo on console layout.

Project Updates 02/20/2009

Friday, February 20th, 2009

The 32′ RP project is still on schedule.  The trunk cabin mock-up is underway and most systems have been installed.

Fresh Imron is covering the 57 Hatteras from the rubrail up, hull has been polished and bottom painted.

With the 29′ Strike we have installed the custom crow’s nest with full controls, gel repairs are complete and the Prop Speed is on.  The customer has added a couple of other things including a Flo-Scan install, outrigger relocation and more.

Bilges have been painted, motor reset on new beds, washdown system in and interior renovation almost complete on the 40′ Robbins.

32′ RP Week of 01/23/09

Monday, January 26th, 2009

Construction and systems installation continued this week.  The skeg was filled with expanding foam and heavily glassed over.  Fuel and freshwater tanks were covered as the cockpit sole was bonded down and glassed in place.  The Bilges received a couple coats of white gel with systems going in as soon as they cured.  Engine beds have been fabricated, bonded and thru-bolted in place.  The engine, holding tank and hot water heater of been put place for plumbing.  Fairing is underway on the v-berth part which has also been tabbed in.

RP 32′ Project Status

Tuesday, January 13th, 2009

The project was started in late 2008. As of now the molded Nida-Core bulkheads and flats are in. The water tanks and fuel tanks are in place and the rough plumbing is underway. Aluminum engine beds have been fabricated and fit. The rudder port is in place. Fiberglass exhaust with a Cyntek muffler is glassed in. Transom door has been cut. The formica covered interior bulkheads are also in place with molded Nida-Core v-berth built and fit. The cockpit and salon soles as well as the washboards are also molded Nida-Core parts and have also been built and fit.

Current Projects

Monday, January 12th, 2009

Composite Yacht has managed to stay busy even during these tough times. We feel very fortunate to have a long list of work orders. Even so do not hesitate to contact us if you would like to take advantage of any of our services. One reason we our busy is because we rarely ever turn down work. Our small amount of real estate means we need to get projects in and out while maintaining our standards of craftsmanship. In time we will have categories for each of the large projects with photos but until then this is what’s going on now….

Construction on 32′ RP hull: This is a Down East - style which will be finished as an Express with Cummins power. A 12′ beam, tall cockpit sides, galley, stand-up head and v-berth will make her a good fit for family cruising and fishing on the Chesapeake.

57′ Hatteras Sportfish: Complete Imron Paint Job, Hull, Decks and Superstructure, Misc. repairs and additions including minor frp repairs and new custom electronics box and rod holders

29′ Stike: New dual Racor unit, Full 1000 hour Cummins service, Misc. gel repairs, Bottom paint, Prop Speed application, and Custom crow’s nest construction and installation with controls

40′ Robbins (Chesapeake Deadrise): V-berth and cabin renovation, New engine beds and bilge paint, Replacing wash-down system and engine box actuator, Relocating batteries

32′ Proline: Custom PPG Hull Paint

30′ Custom Cutts & Case Cruiser: Tuning drive-line, Sound insulation, Varnish, AwlGrip hull and deck

20′ Shamrock: Windshield wipers, Repair port light leaks, New carpet, New engine box seat and AwlGrip

20′ Cat Sailboat: Fabricate trolling motor bracket, Repair center board, AwlGrip decks, Bottom paint, Varnish, Tiller repair, Flex-I-Teak decks

36′ Island Packet: Custom Wheel House Extension